Completed projects

Construction of the Southern Bridge – Phase 4 – Construction of Jāņa Čakstes gatve from Vienības gatve to Valdeķu iela, Riga, Ziepniekkalns neighbourhood

Nord X is carrying out the construction of a 205 m-long overpass, which includes the concreting of 10 abutments, the installation of supports and expansion joints, and concreting the overpass and surface treatment of the concrete structures.

In total – 450 t of reinforcement / 2900 m3 of concrete.

Construction of the new Rail Baltica railway bridge over the Daugava River, Phase 1 works

SIA Nord X, together with the Italian construction company SPIC S.r.l., carried out the concreting works of the new railway bridge using the PERI VARIOKIT VBC balanced cantilever formwork system.

Concrete – 4000 m3

Reinforcement and prestressing tendons – 870 t

New preschool educational institution in the Podnieki quarter, Ādaži

The SIA Nord X team is currently participating in the construction of a new educational institution — a project that will contribute to future generations and the development of the local community.

Within this project, SIA Nord X is carrying out concreting works, reinforcement works, and the installation of precast structures. The scope of work covers the entire construction cycle — starting from foundation works and concluding with the concreting of roof overhangs.

Completed volumes:

Reinforcement: 280 t

Concrete: 2200 m³

Prefabricated concrete elements: 432 pcs

Laflora Wind Park BoP (Balance of Plant) in “Kaigu Peat Bog”, Līvbērze Parish, Jelgava District

Construction of Laflora Wind Park BoP (Balance of Plant) in “Kaigu Peat Bog”, Līvbērze Parish, Jelgava District. Our team carried out the construction of several technologically complex wind turbine foundations within this project.

Each foundation required 175 tons of reinforcement steel and 1234 m³ of concrete, with a foundation radius of 28 m.

The continuous concrete supply and placement lasted 20 hours, making advanced planning and preparation crucial. This was both a challenging and highly responsible process.

University of Latvia Academic Centre HOUSE OF LETTERS, Jelgavas iela 1, Riga

Concrete – 6560 m3

Reinforcement – 945 t

Prefabricated elements: hollow panels HCS – 26 311 m2

Reconstruction of the “AmberBirch” veneer plant, “Finieris”, Krustpils Rural Territory, Jēkabpils Municipality

Concrete – 3750 m3
Reinforcement – 313 t

Prefabricated elements:
Multi-layer facade walls – 490.61 m2
Hollow HCS panels – 499.9 m2
Installation of columns – 77 pcs
Beam assembly – 10 pcs
Plinth walls – 38 pcs

Municipal waste landfill “Janvāri”, Laidze Rural Territory, Talsi Municipality

Concrete – 2473.45 m3

Reinforcement – 237.29 t

Reconstruction of Salaspils Culture Centre “Enerģētiķis” at Skolas iela 2, Salaspils

Concrete – 1808 m3

Reinforcement – 206 t

The new prison complex at 29 Alsungas Street, Liepaja

Concrete – 2294.98 m3

Reinforcment – 323.33 t

Precast element:

  • Single-layer walls  –  3480.40 m2
  • Multi-layer facade walls – 2154.80 m2
  • Hollow panels HCS– 4068.3 m2
  • Column installation – 51pcs

Rail Baltica Riga railway bridge, railway embankment and Riga Central Passenger Station

Concrete –  14 000 m3

Reinforcment – 2100 t

New building of Dr Mauriņš Clinic

Jaunā Mežaparka iela 4, Riga

Concrete – 1500 m3

Reinforcement – 300 t

Construction of residential buildings and associated infrastructure at Kupriču iela 3A

Concrete – 4811 m3

Reinforcement – 578.4 t

Office building at Mihaila Tāla iela 1, Riga

Concrete – 4139 m3

Reinforcement – 523.11 t

Prefabricated elements:

  • Single-layer walls – 2789.58 m2
  • Multi-layer facade walls – 3360 m2
  • Hollow panels HCS – 11,519.49 m2

Design and construction works for an education and sports centre at 17A Jāņkalna iela, Daba iela and Ezera iela 24A, Alūksne

Concrete – 1400 m3

Reinforcement – 150 t